Aero-Derivative Gas Turbine Product List

FT8® MOBILEPAC® Gas Turbine Package

The FT8®MOBILEPAC® gas turbine package requires a small footprint utilizing an 80 by 54-foot area. 

Very little advanced site preparation is required, and no foundation or concrete pad is necessary for installation of the unit. The unit is transportable by land, sea, or air and modularly packaged for quick, worldwide delivery and installation. 

  • Power generation within two days from arrival at the site 

  • When soil-bearing capacity is excellent

    No ground concrete work required 

  • Integrated housing for the GT and generato

    No site alignment required 

  • Mutual operation at 50 Hz⇔60 Hz

    Dual Frequency

  • Features
  • Arrangements
  • Delivery Record
  • The standard package can easily be reconfigured to operate at either 50 Hz or 60 Hz. 
  • The trailer runs on public roads for prompt use as an emergency power source. 
  • The major components are packaged into two trailers to enable complete installation for power generation in only one day. 
  • Compact enough for air transport to minimize transport time (in addition to land and ocean transport). 
  • The advanced package design eliminates the need for concrete foundations, thereby reducing the cost and time required to complete installation.
Output60 Hz/50 Hz:31 MW/29 MW (Dual Frequency)
FuelDual Fuel (Gas/Oil)
Type of TrailersPower and Control; in-line or parallel configuration
Cooling MethodAir Cooling
trailer
arrangements-img1
arrangements-img2
arrangements-img3
Year of launch2004
Number of units deliveredOver 130 Units

Delivery Results

delivery-result

Venezuela 17 units (2009-2015

solution

Solution

In addition to using the MOBILEPAC® unit (movable, dual-frequency power station) as an emergency power source for disasters and big events, we propose that customers make the most of the features of the MOBILEPAC® unit as a temporary power source for operation during the construction of large power plants of the type shown in the following images. 

  1. If surplus power is to be transmitted in addition to the power source for construction work, the MOBILEPAC® unit is very useful in countries with tight electricity supplies.
  1. A trailer that runs on public roads enables easy disassembly and assembly on site. The MOBILEPAC® unit is moved easily to the next construction site once a power plant is completed. This portability cuts the cost of using a temporary power supply facility.
  1. The portability also provides a power source during periodic inspections.

Aero-Derivative Gas Turbine Services

Mitsubishi Power Aero offers a full range of maintenance, overhaul and repair, and field service for aero-derivative gas turbine engines. We also offer Long Term Service Agreements (LTSA) and Engineering, Procurement, and Construction (EPC) Services.