Development History
Gas Turbines
History of Mitsubishi Power' Gas Turbines
1961 | Technical partnership formed with Westinghouse Electric Corporation. |
---|---|
1963 | A 730°C class MW-171, as the first Mitsubishi Power' commercial gas turbine, comes into operation at Asahi Glass Co., Ltd. in Chiba. |
1976 | Development of the 1,000°C class MW-701B is finished using independent technologies. |
1984 | The 1,150°C class MW-701D becomes the world's first gas turbine to incorporate a pre-mixed combustor and unit comes into commercial operation as Unit 3 in the Higashi Niigata Thermal Power Station of Tohoku Electric Power Co., Inc. |
1986 | Development of the 1,250°C class MF-111 is finished using independent technologies and its first unit comes into commercial operation. |
The technical partnership with Westinghouse Electric Corporation terminated. | |
1987 | A large capacity BFG-fired MW-701D comes into commercial operation at JFE Steel Corporation in Chiba. |
1988 | The first H-25 comes into commercial operation. |
1991 | The first H-15 (as a downscaled model of the H-25 Series) comes into commercial operation. |
1992 | A 1,350°C class M701F gas turbine comes into validation operation. |
1997 | The world's first 1,500°C class M501G comes into validation operation. |
1999 | An M701G comes into commercial operation in the combined cycle power plant as Unit 4 in the Higashi Niigata Thermal Power Station of Tohoku Electric Power Co., Inc. |
2003 | An M701F for residual oil-fired IGCC comes into commercial operation at JXTG Nippon Oil & Energy Corporation at Negishi. |
2004 | A 300 MW BFG-fired M701F comes into commercial operation in a combined cycle power plant as Unit 5 of Kimitsu Cooperative Thermal Power Company, Inc. |
2007 | An air-blown IGCC system comes into verification operation. The unit becomes Unit 10 at the Nakoso Power Station of Joban Joint Power Co., Ltd. in 2013. |
An M701G comes into commercial operation in a combined cycle power plant as Unit 1 at the Kawasaki Thermal Power Station of TEPCO Fuel & Power, Inc. | |
2010 | A 1,400°C class M701F comes into commercial operation in a combined cycle power plant as Unit 4 in the Sendai Power Station of Tohoku Electric Power Co., Inc. |
An H-100, as the world's largest capacity two-shaft gas turbine, comes into commercial operation. | |
2011 | The world's first 1,600°C class M501J comes into validation operation. |
2013 | An M501J comes into commercial operation in a combined cycle power plant in the Himeji No. 2 Power Station of the Kansai Electric Power Co., Inc. |
2015 | An M701F incorporating J-Series technology comes into commercial operation in Unit 3 in the Shin-Sendai Power Station of Tohoku Electric Power Co., Inc. |
2016 | The J-Series commercial unit reaches a cumulative total operating time of 250,000 hours to prove its high reliability. |
A 1,600°C class 50-Hz M701J comes into commercial operation in Unit 2 at the Kawasaki Power Station of TEPCO Fuel & Power, Inc. | |
2020 | The next generation 1,650°C class M501JAC comes into validation operation. |
Products
- GTCC
- Steam Power
- IGCC
- Geothermal
-
Gas Turbines
- Product Lineup
- Comparative Performance
-
Technical Information
- Gas Turbines for Mechanical Drive Applications
- Cutting-Edge Elemental Technology Producing 1600°C Class J Gas Turbines
- Development of High-Efficiency Gas Turbine Applying 1600°C Class J Technology
- Combustor Technologies Supporting Stable Operation
- Overview and Verification Status of T-Point 2 Demonstration Facility
- Comprehensive Efforts from Development to Manufacturing
- Summary of Orders
- Development History
- Product Selection Assistant (Middle & small Class)
- Aero-derivative Gas Turbines
- Steam Turbines
- Boilers
- Air Quality Control Systems (AQCS)
- Generators
-
Control Systems
- What is DIASYS?
- DIASYS Netmation / DIASYS Netmation4S
-
DIASYS Optional Products
- IR-S Infrared Flame Detector
- Net IR-S Infrared Flame Detector
- Rail Mounting Net IR-S
- Boiler Tube Leak Detector
- Shaft Vibration Analyzer
- Simulator
- Advanced Combustion Pressure Fluctuation Monitoring System (A-CPFM) / Combustion Pressure Fluctuation Monitoring System (CPFM)
- Multi-Coal Fired Boiler Optimum Control
- DIASYS Solutions
- Fuel Cells
- Others
- Catalogue
- HIACS Series
- Technical Report